top of page
Search

All 10 Gates at Table Rock Dam to be Opened Tuesday



PRESS RELEASE


BRANSON, Mo. – The Corps of Engineers, Little Rock District will begin a spillway release from Table Rock Dam beginning at 7 a.m. Tuesday, June 25 as part of the ongoing effort to evacuate water captured during heavy spring rains. Five spillway gates will be opened 1 foot each beginning at 7 a.m. By 8 a.m. all 10 gates will have opened 1 foot releasing about 10,500 cubic feet per second combined with the 24-hour hydropower releases of about 9,500 c.f.s. The combined release will be about 20,000 c.f.s. One of the four hydropower turbines is currently off-line. For more information call the Table Rock Lake Project Office at 417-334-4101. Daily lake information can be obtained at www.swl-wc.usace.army.mil or the Corps’ mobile App which can be found in mobile App stores by searching for USACE Little Rock.

Contact Laurie Driver 501-324-5551

Release no. 19-093

Recent Posts

See All

Four gates open at Table Rock Dam

The U.S. Army Corps of Engineers began a spillway release from Table Rock Dam on Saturday May 30, 2020 at noon. The total spillway flow is around 5,500 cubic feet per second. The total release from th

bottom of page